Commissioning Services
Building commissioning is a maturing low-cost, low-risk process that could be the single most cost-effective strategy for reducing energy costs and greenhouse gas (GHG) emissions in buildings today.
As a process rather than a set of prescriptive measures, commissioning is a proven way to optimize building systems operations and performance. Whether constructing a new facility or evaluating an existing building, the process adapts to meet the unique needs of each building, owner, operator(s), facility user group(s) and / or occupant(s). DUNE Engineering’s Commissioning Team is well positioned to help ensure your buildings are designed and constructed as intended and that they operate in a way that meets the owner’s project requirements. Overall, a well commissioned building, whether through new or existing commissioning processes, will perform better and use energy more efficiently. DUNE’s Commissioning Team and processes also support the energy-efficient goals of the National Energy Code of Canada for Buildings and other emerging provincial and municipal building energy codes, standards and guidelines such as those put out by CSA, ASHRAE, The Building Commissioning Association (BCxA) and LEED, for example.
In today’s buildings more than ever, facility operations require building systems and subsystem components to work effectively and efficiently and integrate with one another on a monitoring and controllability level. As well, building staff requires increasing knowledge, training and resources to operate and maintain buildings in an optimal fashion. No matter how prudently a building is designed and constructed, if the systems and equipment are not installed, set up and operating as required, the building will underperform. Similarly, through various building fit-outs and systems upgrades or retrofits, building systems continuity is often not in scope or overlooked. With the increasing complexity of interactive and sophisticated control systems, even small problems can have big effects on performance with costly results that trickle down to long-term building operations and energy usage. Additionally, in today’s construction environment, project teams are more cost- conscious than ever and seldom are quality assurance processes adequately budgeted for. Hence, the onslaught of various industry commissioning guidelines and standards. Our professionals at DUNE Engineering are positioned to provide guidance and tailor and execute a comprehensive commissioning program to suit your building needs.
New Building Commissioning (Cx)
is a rigorous quality assurance process with advantages that begin to enhance project delivery as early as conceptual design, and continues through various milestones including detailed design, construction, start-up testing and fine tuning, Owner training, occupancy, and usually through the first year of operation. Commissioning helps ensure and verifies that the new building and its systems are adequately designed, selected, installed, started-up, tested to operate and perform as design intended in accordance with the Owner’s project requirements, and that building staff are properly trained to operate and maintain the systems and equipment with sufficient documentation turned over to operate and maintain the commissioned systems in peak operating condition for years to come. Many commissioning guidelines also require a building systems manual be developed to provide a means to document and thoroughly understand the building operating systems and subsequent system requirements with directions to continue periodic re-commissioning or ongoing commissioning tasks
Existing Building Commissioning (EBCx)
essentially encompasses the terms Re- Commissioning (Re-Cx) and Retro-Commissioning (Retro-Cx). Ongoing Commissioning (O-Cx) is also completed within an existing facility, but is a continual process planned and set up during initial commissioning efforts. You can maintain optimum building performance by commissioning new buildings or retro-commissioning existing buildings and then using re or ongoing commissioning to ensure the persistence of benefits. Regardless of your building’s life cycle phase, it is never too late to start.
Re-Commissioning (Re-Cx)
is a re-optimization process for existing buildings or systems that have already been commissioned with associated documentation retained. The goal of Re-Cx is to ensure the original commissioning benefits persist, and that equipment and systems operate optimally and perform to meet current occupant and operational needs. The original investigative approach is re-assessed and applied to identify operational or performance issues with systems and equipment. The primary outcome of Re-Cx is identifying “low-cost/no-cost” operational improvements given the building’s continued usage in order to maintain comfort conditions with potential energy savings.
Retro-Commissioning (Retro-Cx)
is a commissioning process that applies to existing buildings or systems that were not previously commissioned, and is often completed after space reprogramming or building renovations as obsolete systems can wreak havoc on the building’s energy-using systems. This process seeks to understand, complete documentation and improve how building systems and equipment function together to meet current facility functional requirements and the building’s operating plans. Retro-commissioning processes can also identify and resolve problems that occurred during the initial building design or construction, and address problems that have developed during the building’s operational life cycle.
Ongoing Commissioning (O-Cx)
is a process similar to re-commissioning that maintains building performance on an ongoing periodic basis. Typically planned and set up through initial commissioning efforts, a building systems manual is prepared to provide guidance and to document results. Further review by building operators or specialty vendors may be required.
No matter the approach, DUNE Engineering will tailor a process to assess current operational conditions of energy-consuming systems and controls, identify potential energy-saving measures, pin point easily fixable issues that can be resolved quickly, and coordinate various measures with capital planning to improve overall energy usage by optimizing equipment performance and system integration. So, before proceeding with costly building retrofits, consider Existing Building Commissioning first. Typical “low- cost/no-cost” measures often include fixing control dampers, adjusting primary heating or cooling plant operations, aligning zone temperature set-points, and even eliminating simultaneous heating and cooling. Persistence strategies such as training, monitoring energy bills, energy management information systems and automatic diagnostics are also viable outcomes to maintain building performance.
Fire Protection and Life Safety Integrated Systems Testing
The CAN/ULC-S1001 IST standard is a requirement in both the National Building Code and the National Fire Code for any new buildings prior to gaining occupancy. The National Building and Fire Codes of Canada have referenced CAN/ULC-S1001 since 2015 as the standard requirement to ensure all fire protection and life safety systems within the building(s) are tested as an integrated system and operate in conformance with the design criteria.
Integrated fire protection systems and life safety systems must be designed, installed and tested to their applicable standards. Unidentified systems deficiencies or failure to fully verify systems and their integration could result in the systems not performing in the way they were intended during a fire event for example. A failure could lead to inadequate water supply or fire suppression response, or fire and/or smoke not being controlled and spreading through the facility via egress paths or areas of refuge. Properly functioning and integrated fire protection systems and life safety systems should avoid delays in the notifications, evacuation and/or movement of persons to a safe location.
Simply put, where there are fire protection and life safety systems with functions that are integrated with each other, the systems shall be tested as a whole in accordance with CAN/ULC-S1001 – Integrated Systems Testing of Fire Protection and Life Safety Systems to verify that the systems properly integrate with one another as the design intended.
As a requirement under new construction, an Integrated Systems Testing Coordinator shall be retained to develop a project specific plan and procedure that is unique to each facility, and include all applicable integrations of the Fire Alarm Systems various integrated inputs, outputs, notifications and call outs; Notification and Mass Notification Systems; Elevator(s) and Lifts; Emergency Generators; Audio/Visual Systems; Lighting Control Systems; Water Supplies, Control and Freeze Protection Systems; Fixed Fire Suppression Fire Pump(s), Sprinkler System(s), Standpipes & Hoses, Kitchen / Cooking or Electrical / Data Space Specific Equipment Fire Suppression Systems; Ventilation Systems (Air Handling Units, Pressurization Units, Smoke Controls), Security and Access Controls Systems, as well as various other life safety technologies such as those found in hospitals (Nurse Call, Duress, Lighting Pathways etc).
For ongoing building operations or existing buildings, as required by CAN/ULC-S1001:2011 (R2017); the building Owner is responsible to arrange future testing which is to be conducted one year after completion of the initial Integrated Systems Testing, or date of Occupancy, and to continue periodic testing not to exceed five-year intervals after that. Also, where any modifications to the fire protection and life safety systems are made which affect system integrations; Integrated Systems Testing of the affected integrations shall be conducted, and would include reconciling any number of building upgrades, or even replacement or installing something as small as an egress path mag lock. Generally, for existing buildings, while still a requirement, industry is looking to educate building owners to begin collecting relevant building documentation that is often challenging, for preparation for Integrated Systems Testing in the future.
What is ADDAPT
ADDAPT is a living repository for client buildings and projects, so a client can track equipment and testing during construction and can access the same data years later for continual and retro commissioning projects.
A hub of critical data for Commissioning Agents, Owners, and Maintenance Personnel during and after construction for the life of the building.
It is widely used for commissioning (Cx) and retro-commissioning (RCx) construction projects for residential, commercial, and institutional buildings
Cx and RCx Applications:
ADDAPT tracks via online platform using a portable or fixed device to track Cx/RCx issues, static and dynamic checks using online forms, online functional testing forms and close out documentation either accessible on the web portal or in printable form.
Energy and GHG Monitoring Applications:
ADDAPT tracks and monitors greenhouse gas (GHG) emissions using physical data meters installed in the building to track the input and output carbon emissions for a building. For energy tracking, ADDAPT uses enabled energy sensors to track real-time energy consumption for the building whether its propane or natural gas, fuel oil, and/or electricity installed by a local professional.
Sensors are placed directly on the equipment or energy distribution infrastructure to collect data. It identifies early warnings signs of impending issues and validates and verifies energy consumption with associated emissions reductions.
If the buildings are equipped with a building management system (BMS), energy tracking can also be performed provided the BMS is setup with the appropriate interfaces.
Energy Consumption Tracking and Verification:
Data input from the energy model as a baseline
Monitors the energy consumption and GHGs using the energy sensors or the BMS.
Asset Management Platform:
ADDAPT is also used as an asset management platform delivering real-time data to building operators. It maintains a living inventory of all the building’s physical assets using equipment tag scanning while on site or from the desktop/laptop using the Matterport™ Scan function.
This living inventory exists to support maintenance management and allows an operator to track scheduled projects and associated costs to plan appropriately. Additionally, operators can easily manage the addition or subtraction of building assets and maintain a historical record of all the projects on a singular platform.
On site level, the platform provides the following key benefits for facility operators and managers such as:
QR scan of on site equipment to access Cx forms, product submittals, installation instructions and much, much more.
Identify opportunities to down-size major pieces of equipment with lightened energy loads
Features:
Allows for control for User Access with permissions to accessing data and information
Provides adjustable automated emails for status or activity updates during construction
Online commissioning (cx) start-up and verification forms
Provides an inventory of photos from on site for future renovations or additions.
Maintains an online shop drawing submittals during and after construction is complete.
Provides the User with online and active milestone scheduler during construction as third party Cx agent
Provides equipment tag lists and equipment tag scanning capabilities for access to operation and maintenance logs, shop drawings, completed cx forms, and much more.
Collects and maintains activity logs and comments during and after construction
Automates and creates a printable operation and maintenance manual
Provides real time equipment statuses / Progress Workflows during the commissioning phases
Stores owner online training videos for future maintenance activities
Stores and creates preliminary and final Cx plans reducing rework for field Cx agents
Optional: Provides real time energy consumption and greenhouse gas emission monitoring and recording.
Optional: Stores and displays 3D matterport™ scan with tag overlays with rough-in and final 3D walkthroughs
Optional: Online store to order parts from suppliers and vendors for repairs and maintenance purposes.
Online and Printable Forms such as:
Provides instant unaudited and audited reports on project status using an online web portal enabling access any time
Generates system manuals with ease by clicking a button in PDF format.
Customization of forms using corporate logos including photos, links to O&M, and matterport™ scans
Detailed Energy Assessments
Auditing your building’s energy usage is the first step to gauging how your facility is performing and creating a solid plan for improving its performance. Continuous improvements guided by a detailed energy assessment can help your team correct lingering control deficiencies while achieving high energy performance, improving indoor environment quality, improving tenant productivity, reducing environmental impact and reducing annual energy costs.
Without an energy audit to prioritize your project list based on measurable financial and environmental performance metrics, you may spend money on ineffective or unnecessary projects.
The American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) outlines three different levels of energy audits. The audit levels differ based on level of effort/analysis and the level of detail of the results and recommendations.
Walk-Through Survey: ASHRAE Level 1
The walk-thorough analysis is the basic starting point for building energy investigations. This stage begins with conducting an energy use analysis by reviewing past utility bills to determine how much energy the building uses and how it compares to similar buildings in similar climates. Next, a walk-through of the building is conducted, including brief interviews with facility operators. From this we are able to propose low-cost/no-cost energy conservation measures and a list of capital improvements that warrant a further level of analysis.
The Walk-Through Survey is most commonly selected when the goal is to confirm that the potential for savings exists, or to help an owner with multiple buildings prioritize which should be assessed in more detail first.
Detailed Energy Assessment: ASHRAE Level 2
The Detailed Energy Audit includes the completion of all aspects of the Walk-Through Survey, as well as more detailed energy calculations and financial analysis of identified Energy Conservation Measures (ECMs) and Energy Efficiency Measures (EEMs). This process is a thorough evaluation of building envelope, lighting systems and controls, HVAC systems and controls, domestic hot water, plug loads and process energy uses. A list of practical measures is developed and analyzed, including the presentation of operating cost reductions and capital expense requirements for each. A Detailed Energy Assessment usually, but not always, includes the use of energy modeling software to assist in energy performance calculations.
Detailed Analysis of Capital -Intensive Modifications: ASHRAE Level 3
The Level 3 audit builds on the Level 2 audit by doing a more in-depth analysis of energy use in the building. Detailed gathering of energy consumption and building controls data is conducted and analyzed more intensely for areas of improvement and potential costs. This may include the installation of temporary or permanent sub-metering equipment for major energy systems. The added level of detail in the analysis of the existing building and proposed energy measures means that cost and savings have an increased level of accuracy. This level of detail can provide higher quality, more accurate data, which is valuable when considering major energy projects that can be capital-intensive.
Energy Modelling
The National Energy Code for Buildings (NECB) establishes building standards for commercial buildings and requires that a minimum energy and environmental performance be met. The national energy code offers flexibility with three compliance paths: prescriptive, trade-off and performance.
Prescriptive Path:
Involves following the prescriptive requirements of each section of the code. It basically operates as a checklist to be followed. DUNE Engineering can assist with the prescriptive path checklists required for your jurisdiction, which must be submitted with the construction drawings and mechanical specifications as part of your building permit application.
Trade-off Path:
Provides more flexibility in design, enabling the facility owner and design team to trade elements within the same “part” of the energy code. For example, if your design calls for more window area than prescribed by the code, you may be able to compensate by improving the insulation in the building envelope.
Performance Path:
Offers the most design flexibility and requires that the building simply demonstrate that the proposed design will not consume more energy than an equivalent building built to the standards of the NECB prescriptive path. This path is often accessed as it enables the energy modeller, designer and builder the freedom to find the most economical way to meet the building code.
DUNE Engineering utilizes Integrated Environmental Solutions – Virtual Environment energy modeling software to demonstrate compliance with the national energy code. This software is compliant with ASHREA Standard 140 and is accepted for NECB compliance modelling.
Whatever path you choose, our energy engineering team will be happy to provide guidance and assistance to meet your code compliance needs.
Indoor Air Quality (IAQ) Testing & Evaluations
DUNE Engineering now offers comprehensive Indoor Air Quality (IAQ) Testing and Evaluations, leveraging our skilled professionals and cutting-edge Q-TrakTM XP Indoor Air Quality Monitor (Model 7585). Our service encompasses detailed on-site investigations along with various metering measurements and data collection methods, followed by thorough analysis and reporting. This service is ideal for commercial and office spaces, educational institutions, healthcare facilities, public buildings, and transportation hubs, or really any place where indoor air quality may be of concern. Considering that people spend over 90% of their time indoors, IAQ is vital for occupant well-being and productivity. Poor IAQ can adversely affect health, job performance, and learning abilities. Sources of indoor air quality concerns or pollution are diverse, ranging from personal products and building materials and HVAC systems to cleaning chemicals and even outdoor pollutants infiltrating or migrating amongst the building and spaces.
We can provide real-time to longer-term data-logging for monitoring and evaluations of indoor air quality and thermal comfort parameters within various spaces, buildings or complexes. Our services provide powerful measurements, calculations and tables that can include some 20 plus common IAQ parameters, quantifications of 6 common gas measurements, PM1.0, PM2.5 and PM10 mass concentrations and particle counts, along with common temperature, relative humidity, barometric pressure, % outside air, dew point and wet bulb temperatures. Some common gas sensors that can be set up for the particular environment can include Carbon Dioxide (CO2), Carbon Monoxide (CO), Formaldehyde (CH2O), Ozone (O3), Chlorine (CL), Ammonia (NH3), Hydrogen Sulfide (H2S), Nitrogen Oxide (NO) and Nitrogen Dioxide (NO2). Total Volatile Organic Compounds (TVOCs) are also measured in Low Range (PPB), and High Range (PPM).
Through our on-site investigations and measurements, we quantify and analyze results to identify concerns and provide insights for effective remediation strategies. Additionally, we offer assistance in proactive project planning, including before and after measurements. Along with our data analysis and concise reporting, this approach aids in identifying priority projects and quantifying or verifying the results of ventilation upgrade projects. We offer a range of comprehensive measures and solutions that can be tailored to your needs.
At DUNE Engineering, we prioritize the health and comfort of indoor environments. Trust us for your IAQ needs, ensuring spaces where occupants can thrive in a healthy and productive atmosphere.
Our Services
Building Manuals
There are numerous different types of building manuals available today. While there is a distinct difference between Operations and Maintenance Manuals developed and delivered through the Construction and Turn-Over Processes, there are several cross references and subtle nuances between O&M Manuals and Building Systems Manuals, Facility Guides or the various other titles and contents that can be provided as part of the commissioning process to assist with the operations, maintenance, and performance of your facility. One commonality is certainly that each manual is uniquely created to capture a specific project. Whether developing new or replacement documentation for a facility, under new construction, renovations, modernizations, or upgrades etc.; these manuals are customized with information on the design, operation, maintenance, and performance of your facility for ongoing operations, maintenance and/or to better understand your building systems with information and guides to maintain optimal systems performance.
Operations & Maintenance Manuals
Architectural, Electrical, Mechanical and Controls documents typically compiled in a specified format, that include clear systems descriptions, general operating and maintenance tasks and scheduled instructions, as well as the various other construction submittals such as equipment submittals, start-up, testing and certification reports, warranty information, and as-built documentation pertinent to the operations and maintenance of your facility. ASHRAE Guideline 4-2019 also overs the format, content, delivery, and updating of operations and maintenance (O&M) documentation for HVAC & R systems.
Building Systems Manuals
Systems Manuals provide a means for the current and future operating staff to understand and optimally operate and monitor each building system. These manuals also promote a deeper understanding and knowledge transfer of the building’s systems and equipment for the building operations team, and any subsequent operators not yet trained on the systems to operate, monitor and maintain the facility in optimal conditions. This manual is in addition, and a companion document to the O&M Manuals typically submitted by the construction team. Production of a Systems Manual encompasses gathering the information related to the facility, equipment, systems, and assemblies from the planning, design, construction, testing, commissioning and training activities, along with facility operational and performance requirements and incorporating it into a usable information resource. This typically includes final project documentation including the Owners Project Requirements (OPR), Basis of Design (BOD), a Commissioning (Cx) Plan and Progress Reports if included, submittals, and references to manufacturer installation operation and maintenance manuals, building O&M manuals, system schematics, record drawings, performance testing results, and training or any other relevant materials. These manuals typically focus on the key energy consuming or producing systems in the facility such as heating, cooling, ventilation, heat recovery, solar voltaics, lighting, etc. and can further include roofing and envelope items. Systems manuals are typically specified with construction projects or through new construction or existing building commissioning processes with documentation readily available but can be prepared for any facility or system.
Facility or Building Operation Guides
These facility guides are often a component of a Systems Manual or developed through Ongoing Commissioning and make an essential facility companion document on their own. A Building Operating Guide is generally a basic composite of building systems descriptions and an operating plan with general procedures to align required facility operating conditions (or current facility requirements) with the necessary set points, schedules, and operating procedures for how the facility is required to work. These guides assist with reconciling operating plans, building and equipment operating schedules, set points and ranges, sequences of operation, systems and equipment limitations to optimize performance.